Western Fresno

Irrigationinfrastructure
Bedrock is heavily involved with the maintenance and retrofitting of canals and irrigation infrastructure in Western Fresno and Madera Counties. Bedrock performed the topographic and construction surveying for renovations on the First and Second Lift, Columbia, and Pacheco Lateral 3 canals, among others. Bedrock also ran a 58-mile level loop to analyze land subsidence in the San Joaquin River corridor.